चमेरा पावर स्टेशन-1, एनएचपीसी, खैरी, चंबा (हि.प्र.)
CHAMERA POWER STATION-1, NHPC, KHAIRI, CHAMBA (H.P)
Water Discharge Data
Actual Required Flow 15% of Average Lean Period Discharge (Cumecs):
12.00
Actual Flow Released
(Cumecs):
15.18
Date from:
to:
Download this data
Online Water Discharge Chart
Date
Time
Actual Required Flow 15% Of Average Lean Period Discharge (Cumecs)
ActualFlowReleased Minimum(Cumecs)
Excess Released
Remark
2025-04-04
00:00
12.00
15.09
3.09
2025-04-04
00:15
12.00
15.12
3.12
2025-04-04
00:30
12.00
15.09
3.09
2025-04-04
00:45
12.00
15.12
3.12
2025-04-04
01:00
12.00
15.12
3.12
2025-04-04
01:15
12.00
15.12
3.12
2025-04-04
01:30
12.00
15.12
3.12
2025-04-04
01:45
12.00
15.12
3.12
2025-04-04
02:00
12.00
15.15
3.15
2025-04-04
02:15
12.00
15.15
3.15
2025-04-04
02:30
12.00
15.15
3.15
2025-04-04
02:45
12.00
15.15
3.15
2025-04-04
03:00
12.00
15.15
3.15
2025-04-04
03:15
12.00
15.15
3.15
2025-04-04
03:30
12.00
15.18
3.18
2025-04-04
03:45
12.00
15.18
3.18
2025-04-04
04:00
12.00
15.18
3.18
2025-04-04
04:15
12.00
15.18
3.18
2025-04-04
04:30
12.00
15.18
3.18
2025-04-04
04:45
12.00
15.18
3.18
2025-04-04
05:00
12.00
15.18
3.18
2025-04-04
05:15
12.00
15.18
3.18
2025-04-04
05:30
12.00
15.18
3.18
2025-04-04
05:45
12.00
15.18
3.18
2025-04-04
06:00
12.00
15.18
3.18
2025-04-04
06:15
12.00
15.18
3.18
2025-04-04
06:30
12.00
15.18
3.18
2025-04-04
06:45
12.00
15.18
3.18
2025-04-04
07:00
12.00
15.18
3.18
2025-04-04
07:15
12.00
15.18
3.18