Water Discharge Data
Actual Required Flow 15% of Average Lean Period Discharge (Cumecs):
12.00
Actual Flow Released
(Cumecs):
15.01
Date from:
to:
Download this data
Online Water Discharge Chart
Date
Time
Actual Required Flow 15% Of Average Lean Period Discharge (Cumecs)
ActualFlowReleased Minimum(Cumecs)
Excess Released
Remark
2024-12-11
00:00
12.00
14.98
2.98
2024-12-11
00:15
12.00
14.98
2.98
2024-12-11
00:30
12.00
15.01
3.01
2024-12-11
00:45
12.00
15.01
3.01
2024-12-11
01:00
12.00
15.01
3.01
2024-12-11
01:15
12.00
15.01
3.01
2024-12-11
01:30
12.00
15.01
3.01
2024-12-11
01:45
12.00
15.01
3.01